project showcase
Kingsbrae Garden Amphitheatre
We designed 12 tiers of amphitheatre seating using 506 Redi-Rock® concrete blocks Read more... |
Kennebecasis Valley Library
Our design, which was vital to the library expansion and redevelopment, received several awards Read more... |
Multi-Purpose Pier Structural Survey
We project managed an above and below water structural survey of the multi-purpose pier at Canada’s first and only LNG regasification terminal Read more... |
Tunicate Control at Mussel Farms
We provided recommendations for design improvements to remove sea squirts from mussel culture equipment. Read more... |
Violet Solar Farm
We obtained provincial environmental impact assessment approval to allow for construction of New Brunswick’s first utility-scale solar farm. Read more... |
3 MegaWatt Generator Upgrade
A back-up generator upgrade was required to accommodate ever-increasing server data load at a major data centre that could not be taken offline Read more... |
Burchill Wind Farm
We conducted environmental due diligence, permitting support, and field delineation exercises for a ten turbine 40 MegaWatt plus wind farm in west Saint John. Read more... |
Digby Harbour Design
A design, which was based on the needs of the users and the community, was prepared and included a unique 300 m breakwater to account of poor soil conditions. Read more... |
Ghost-Fishing Gear Retrieval
A total of 540 derelict lobster traps were recovered from the seabed through a compensation project for fish habitat disturbance and hundreds of lobster and crab were set free. Read more... |
Hollis Street Scotiabank
We provided complete building systems design and project management for the replacement of HVAC equipment at this heritage property. Read more... |
Heavy Lift Crane Pad Design
Two crane pads were engineered using geogrid and compacted fills for supporting a 440 tonne crawler crane used for installing bridge girders. Read more... |
Market Slip Dredging
About 3,000 cubic metres of material was dredged by building a road out into the slip and operating heavy equipment during low tides. Read more... |
Wright Street Retaining Wall
We designed a new retaining wall to support Wright Street and associated municipal infrastructure following the collapse of an historical wall. Read more... |
Saint John Energy Headquarters
We conducted environmental due diligence, complete building systems design, and construction management for the new facility. Read more... |
Kiwanis Nursing Home
We designed numerous mechanical and electrical systems for the 30 geriatric and 35 enhanced care long-term nursing home. Read more... |
YMCA-YWCA Decommissioning
We ensured the out-dated facility was decommissioned in a safe and environmentally-responsible manner prior to the site being redeveloped. Read more... |
Housing Inspection Services
Over 1,200 housing inspections were completed within First Nations communities throughout Atlantic Canada, Quebec, and Saskatchewan. Read more... |
Aquaculture Greenhouse Gas
Emissions Assessment We calculated the greenhouse gas emissions related to various components of an aquaculture process line in order for the company to receive certification. Read more... |